Satuan Harga Dasar Material
| No | Bahan Material | Satuan | Rp | Besaran |
|---|---|---|---|---|
| 801 | Bata Merah (m3) | M3 | Rp. | 578.900,- |
| 802 | Pipa Galvanis Ø 63 mm | M1 | Rp. | 48.333,- |
| 803 | Pipa Galvanis Ø 12,5 mm | M1 | Rp. | 12.833,- |
| 804 | Pipa Galvanis Ø 37,5 mm | M1 | Rp. | 22.166,- |
| 805 | Pipa Galvanis Ø 50 mm | M1 | Rp. | 38.166,- |
| 806 | Pipa Galvanis Ø 75 mm | M1 | Rp. | 89.500,- |
| 807 | Pipa HDPE Ø 100 mm | M1 | Rp. | 112.100,- |
| 808 | Pipa HDPE Ø 150 mm | M1 | Rp. | 235.800,- |
| 809 | Pipa HDPE Ø 12,5 mm | M1 | Rp. | 7.000,- |
| 810 | Pipa HDPE Ø 37,5 mm | M1 | Rp. | 28.500,- |
| 811 | Pipa HDPE Ø 50 mm | M1 | Rp. | 36.800,- |
| 812 | Pipa HDPE Ø 75 mm | M1 | Rp. | 75.000,- |
| 813 | Pipa PVC Ø 12,5 mm | M1 | Rp. | 13.500,- |
| 814 | Pipa PVC Ø 25 mm | M1 | Rp. | 22.500,- |
| 815 | Pipa PVC Ø 37,5 mm | M1 | Rp. | 35.000,- |
| 816 | Pipa PVC Ø 50 mm | M1 | Rp. | 38.500,- |
| 817 | Pipa PVC Ø 75 mm | M1 | Rp. | 65.000,- |
| 818 | Pipa PVC Ø 100 mm | M1 | Rp. | 167.500,- |
| 819 | Tee galvanish Ø 12,5 mm | Buah | Rp. | 20.000,- |
| 820 | Valve socket Ø 12,5 mm | Buah | Rp. | 20.000,- |
| 821 | Clam sadle 2x 1,5 " | Buah | Rp. | 40.000,- |
| 822 | Knee galvanish 0,5" | Buah | Rp. | 20.000,- |
| 823 | Water moor kuningan 0,5" | Buah | Rp. | 22.500,- |
| 824 | Double nippel galvanish 0,5" | Buah | Rp. | 20.000,- |
| 825 | Fouket socket galvanish 0,5" | Buah | Rp. | 35.000,- |
Keterangan : Satuan Harga Dasar Material Kab Blora Tahun 2025
Data Ke 801 Sampai 825 Dari 831 Jumlah Satuan Harga Dasar Material