1 |
6.
1.
1.
7
|
Pemasangan 1 buah Tangki Toren Kap. 0,7 m3
|
Buah |
Rp |
1.781.487,- |
2 |
6.
1.
1.
8
|
Pemasangan 1 buah Tangki Toren Kap. 1,5 m3
|
Buah |
Rp |
1.781.487,- |
3 |
6.
1.
1.
10
|
Pemasangan 1 buah Tangki Toren Kap. 3 m3
|
Buah |
Rp |
6.334.704,- |
4 |
6.
1.
1.
12
|
Pemasangan 1 buah Tangki Toren Kap. 5 m3
|
Buah |
Rp |
11.434.304,- |
5 |
6.
1.
2.
3
|
Pemasangan 1 Unit Pompa Booster 150 lpm; Vertical In Line –
|
Unit |
Rp |
58.170.080,- |
6 |
6.
1.
2.
4
|
Pemasangan 1 Unit Pompa Jet 27 lpm
|
Unit |
Rp |
49.861.724,- |
7 |
6.
1.
2.
6
|
Pemasangan 1 Unit Pompa Jet 100 lpm
|
Unit |
Rp |
4.728.724,- |
8 |
6.
1.
2.
8.a
|
Pemasangan 1 Unit Pompa Sumbmersible ( Speed For Pump data = 10700 rpm, rateflow 5 m3/h, ratehead = 73 - 100 m )
|
Unit |
Rp |
21.030.787,- |
9 |
6.
2.
3.
2
|
Pemasangan 1 Unit Grease Trap Portable Stainless, Kap. 30 Liter
|
Unit |
Rp |
623.877,- |
10 |
6.
3.
1.
1
|
Pemasangan 1 buah Bak Kontrol Pasangan Bata 30 cm x 30 cm Tinggi 35 cm dengan Tutup Beton
|
Buah |
Rp |
550.030,- |
11 |
6.
3.
1.
2
|
Pemasangan 1 buah Bak Kontrol Pasangan Bata 45 cm x 45 cm Tinggi 50 cm dengan Tutup Beton
|
Buah |
Rp |
770.319,- |
12 |
6.
3.
1.
3
|
Pemasangan 1 buah Bak Kontrol Pasangan Bata 60 cm x 60 cm Tinggi 65 cm dengan Tutup Beton
|
Buah |
Rp |
935.755,- |
13 |
6.
4.
1.
1
|
Pemasangan 1 m pipa PVC AW, Dia. 1/2" (15 mm)
|
M1 |
Rp |
27.141,- |
14 |
6.
4.
1.
3
|
Pemasangan 1 m pipa PVC AW, Dia. 1/2" (15 mm)
|
M1 |
Rp |
46.188,- |
15 |
6.
4.
1.
5
|
Pemasangan 1 m pipa PVC AW, Dia. 1-1/2" (40 mm)
|
M1 |
Rp |
71.588,- |
16 |
6.
4.
1.
6
|
Pemasangan 1 m pipa PVC AW, Dia. 2" (50 mm)
|
M1 |
Rp |
82.366,- |
17 |
6.
4.
1.
8
|
Pemasangan 1 m pipa PVC AW, Dia. 3" (80 mm)
|
M1 |
Rp |
134.786,- |
18 |
6.
4.
1.
11
|
Pemasangan 1 m pipa PVC AW, Dia. 6" (150 mm)
|
M1 |
Rp |
463.219,- |
19 |
6.
4.
1.
12
|
Pemasangan 1 m pipa PVC AW, Dia. 8" (200 mm)
|
M1 |
Rp |
711.183,- |
20 |
6.
4.
1.
19
|
Pemasangan 1 m pipa PVC D, Dia. 2" (50 mm)
|
M1 |
Rp |
49.270,- |
21 |
6.
4.
1.
21
|
Pemasangan 1 m pipa PVC D, Dia. 3" (80 mm)
|
M1 |
Rp |
81.753,- |
22 |
6.
4.
1.
22
|
Pemasangan 1 m pipa PVC D, Dia. 4" (100 mm)
|
M1 |
Rp |
159.415,- |
23 |
6.
4.
2.
1
|
Pemasangan 1 m Pipa Galvanis MED CLASS Dia. 1/2" (15 mm)
|
M1 |
Rp |
32.732,- |
24 |
6.
4.
2.
5
|
Pemasangan 1 m Pipa Galvanis MED CLASS, Dia. 1-1/2" (40 mm)
|
M1 |
Rp |
70.859,- |
25 |
6.
4.
2.
6
|
Pemasangan 1 m Pipa Galvanis MED CLASS, Dia. 2" (50 mm)
|
M1 |
Rp |
108.477,- |